Before You Commit
Factory Capability Assessment FCA
Verify whether declared equipment, staffing and production capacity match the buyer requirement.
01
What this inspection is
Verify whether declared equipment, staffing and production capacity match the buyer requirement. The final scope is confirmed by operations before field execution.
02
When to use it
Before a large or time-sensitive order where delivery depends on real factory capacity rather than brochure claims.
03
What we verify
- Production lines and relevant machinery
- Shift pattern and workforce availability
- Observed bottlenecks and subcontracting exposure
- Capacity evidence against order requirement
- Lead-time realism and production planning controls
04
What you receive
A capability assessment showing observed production resources, constraints and planning risks.
05
How the result is used
The report states what was checked, the evidence observed, limitations and the result within the agreed scope. It does not replace buyer-specific contractual, legal or laboratory requirements.