Before Production
Pre-Production Inspection PPI
Verify readiness before mass production begins.
01
What this inspection is
Verify readiness before mass production begins. The final scope is confirmed by operations before field execution.
02
When to use it
Before production release when materials, approved samples, specifications or tooling need confirmation.
03
What we verify
- Approved sample and specification availability
- Raw materials and key components
- Tooling, molds and production setup
- Production schedule and readiness
- Critical quality points to control during production
04
What you receive
A production-readiness report showing what is ready, what is missing, and what should be controlled next.
05
How the result is used
The report states what was checked, the evidence observed, limitations and the result within the agreed scope. It does not replace buyer-specific contractual, legal or laboratory requirements.